The final components of the mega crane, which will be used to raise the roof trusses into position atop PE's 2010 stadium, have arrived!

Here one can clearly see the winch section of the soon-to-be-assembled mega crane.

Some of the weights (we assume) which will be used to on the 600-ton capacity crane.

In the background can be seen the mobile part of the crane on which the boom will be mounted.

A close-up of the crane's control cabin. Note the tank-like tracks on either side.

The templates (grey) around which the trusses (white) are being assembled. Note the circular shape near the ground in the distance. Presumably this will be lifted onto the template where the rest of the truss will be assembled. There will be 36 trusses in all.